Notes for wClips-120125-1/0:00:00: Difference between revisions

From Drorbn
Jump to navigationJump to search
No edit summary
 
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
We started with two handouts:
We started with two handouts:
{|
{|width=100%
|- align=center
|- align=center
|http://katlas.math.toronto.edu/drorbn/AcademicPensieve/Classes/12-wClips/thumbs/HowToUseThisSite.png
|width=50%|http://katlas.math.toronto.edu/drorbn/AcademicPensieve/Classes/12-wClips/thumbs/HowToUseThisSite.png
|http://katlas.math.toronto.edu/drorbn/AcademicPensieve/2012-01/thumbs/InfrastructureProject.png
|width=50%|http://katlas.math.toronto.edu/drorbn/AcademicPensieve/2012-01/thumbs/InfrastructureProject.png
|- align=center
|{{Pensieve link|Classes/12-wClips/one/How_to_use_this_site.pdf|How to use this site}}
|{{Pensieve link|2012-01/one/The_Most_Important_Missing_Infrastructure_Project_in_Knot_Theory.pdf|The Most Important Missing Infrastructure Project in Knot Theory}}
|}
|}
The full size handouts are "{{Pensieve link|Classes/12-wClips/one/How_to_use_this_site.pdf|How to use this site}}" and "{{Pensieve link|2012-01/one/The_Most_Important_Missing_Infrastructure_Project_in_Knot_Theory.pdf|The Most Important Missing Infrastructure Project in Knot Theory}}".

Latest revision as of 19:57, 25 February 2012